New construction in Arlington, MA

New homes in Arlington must be fossil-fuel-free, need a tree plan, mailed neighbor notice and stormwater approval, and may wait 12 months on demolition.

A teardown in Arlington starts with the inventory. If the Historical Commission finds the house preferably preserved, the demolition permit waits at least twelve months from the application. Then come the tree plan, filed with the Tree Warden before or with the demolition permit, and the first-class mail notice to abutters and occupants within 200 feet.

The new house can't have gas or oil piping under the fossil-fuel-free bylaw, and the stormwater bylaw applies once 350 square feet of new impervious surface is involved, which every new house exceeds. During construction the site-control rules apply: neat site, waste secured daily, dumpsters emptied or swapped every 30 days.

Questions

New construction in Arlington, answered.

What has to happen before an Arlington teardown starts?

Historical Commission review if the house is inventoried, a Tree Plan to the Tree Warden, and mailed notice to everyone within 200 feet at least seven days before site work.

Our new construction work.

See all 2 photos →

Photos from our jobs around Greater Boston.

New construction near Arlington.

Where this information comes from

Rules change. These are summaries of Arlington's and Massachusetts' published rules as of our last check, not legal advice; your project's permits are confirmed with the town when we file them.

Free estimate

Planning new construction in Arlington?

We'll come out, measure, listen, and send a written estimate. The visit is free and there's no pressure to sign.

Call 617-934-1875
What are you planning?
or call 617-934-1875
Call 617-934-1875Free estimate