Building new in Belmont means a 12-month stay if the old house is on the significant list, a stormwater permit, and new sewer and storm lines from the main.

Large new white colonial home with three-car garage
Our new construction work

Belmont rules that apply

What Belmont requires for new construction.

How new construction goes in Belmont.

A Belmont rebuild starts by checking the List of Historically Significant Buildings. If the house is on it, the demolition permit pauses for a Historic District Commission hearing, and a finding of preferably preserved means a 12-month stay while alternatives are explored.

The packet applies Belmont's stormwater and erosion control bylaw to every new house, and the rules require new sewer and storm services run from the main, with DPW's street opening permit only after the connection permit issues. On Somerset Street, a new driveway cut through the stone walls needs Planning Board approval. New detached buildings in Belmont, ADUs included, follow the Specialized energy code.

Questions

New construction in Belmont, answered.

How long can Belmont delay demolition of my house?

Twelve months, if it's on the significant buildings list and the Historic District Commission finds it preferably preserved after a hearing.

Our new construction work.

See all 2 photos →

Photos from our jobs around Greater Boston.

New construction near Belmont.

Free estimate

Planning new construction in Belmont?

We'll come out, measure, listen, and send a written estimate. The visit is free and there's no pressure to sign.

Call 617-934-1875
What are you planning?
or call 617-934-1875
Call 617-934-1875Free estimate